PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Protecting net around the excavated area Facing South-East (800x600).jpg Setting up the Shear Walls at Elev. 5-6 2nd Floor Facing South-East (800x600).jpg Closed up wall froms Facing South-East (800x600).jpg Excavated area between G-K and 5 Line  Facing South-West (800x600).jpg Setting the Shear Wall panels at Elev. 5-6 2nd Floor Facing North-West (800x600).jpg Finished Mockup in front of Mast Trailer (800x600).jpg Rebar Mat at Elev. 4-Stair -2 2nd Floor Facing West (800x600).jpg Setting up the Mockup in front of MAST trailer (800x600).jpg Excavated area between G-K and 5 Line  Facing North (800x600).jpg
Previous pageNext page Setting the Shear Wall panels at Elev. 5-6 2nd Floor Facing North-West (800x600)
Setting the Shear Wall panels at Elev. 5-6 2nd Floor Facing North-West (800x600)